Project Description

New Foundation – Mill Valley

Completed projectSlide thumbnail

Completed project

Excavating the basementSlide thumbnail

Excavating the basement

Slide backgroundSlide thumbnail

Excavating the garage

Slide backgroundSlide thumbnail

Temporary shoring at basement

Slide backgroundSlide thumbnail

Drilled shafts for tiebacks

Slide backgroundSlide thumbnail

Temporary shotcrete wall at garage upper lift

Slide backgroundSlide thumbnail

Soil Nails and Shotcrete holds Excavated Soil

Slide backgroundSlide thumbnail

Reinforcing steel for permanent wall

Slide backgroundSlide thumbnail

Waterproofing membrane in the background

Slide backgroundSlide thumbnail

Shotcrete placement for permanent wall

Slide backgroundSlide thumbnail

Building forms for the concrete garage roof

Slide backgroundSlide thumbnail

Formwork for garage door opening

Slide backgroundSlide thumbnail

View of garage roof and concrete elevator shaft from above

Slide backgroundSlide thumbnail

Garage roof with electrical distribution prepared for concrete placement

Slide backgroundSlide thumbnail

Structural slab with moisture barrier and underground electrical conduits

Slide backgroundSlide thumbnail

Concrete garage roof

Slide backgroundSlide thumbnail

Structural slab with moisture barrier and underground electrical conduits

Hillside foundation for a Mill Valley home

The Challenge: The foundation and garage construction for this Mill Valley home required deep excavation into a steep hillside. The garage was designed to have a rooftop garden and an elevator leading up to the house. The hillside was rocky, so excavation would be particularly difficult. Additionally, the hillside had to be effectively shored and an underground springs continuously dewatered during the excavation and foundation construction operations.

Our Solution: We retained an engineering firm to produce a shoring design for this project. We shored the hill in 8’ lifts utilizing tiebacks and reinforced shotcrete.

With the assurance that the excavated area was totally stable,we began constructing the permanent foundation and retaining walls. During the course of the construction, we placed an advanced waterproof membrane, gravel and a sophisticated drainage system between the temporary shoring and the garage walls to enable water from the underground spring and rain to drain properly. The waterproof membrane and the drainage system would safeguard the concrete walls against water infiltration into the garage, basement and elevator shaft and eventual corrosion of the concrete.

Once the garage and its concrete roof were completed, we built terrace walls on the roof of the garage with its own waterproofing and drainage system. At the end of the project, the hillside was completely reconstructed above the garage and planted.